New Construction
- Billing name and phone number.
- Billing address
- 911 Address of the new service location
- Building permit issued by the County Building Inspector
An LUB representative will visit the site to determine the costs of extending service to the location. From that, the Aid to Construction amount due is calculated, if any. LUB work is scheduled once the Aid to Construction and applicable tap fees are paid.
NEW CONTRIBUTION-IN-AID OF CONSTRUCTION
ELECTRIC NEW SERVICE CONNECTION FEES
In many instances, policies will require Customers or Developers to make a contribution-in-aid of construction. The Engineering Department will meet with Customer and a cost will be estimated at that time.
WATER NEW SERVICE CONNECTION FEES
Where LUB service mains do not currently extend to the new service address, the Engineering Department will meet with the Customer and/or Developer. An aid-to-construction to extend the service main will be provided.
NEW RESIDENTIAL SERVICE
Connection Fee $ 700.00
Facilities Charge $ 250.50
Total Connection Fee $ 950.50
An accessible shut-off valve shall be installed on customer side of meter in service line with approved valve box.
NEW SPRINKLER & IRRIGATION SYSTEMS
Sub-connection Fee $ 400.00
We reserve the right to disconnect when needed.
NEW COMMERCIAL & INDUSTRIAL SERVICE
Water connection must be installed according to specifications of Loudon Utilities.
Facilities Charge will be calculated based on estimated daily flow at a rate of $1.50 per gallon.
SEWER NEW SERVICE CONNECTION FEES
Where LUB service mains do not currently extend to the new service address, the Engineering Department will meet with the Customer and/or Developer. An aid-to-construction to extend the service main will be provided.
NEW RESIDENTIAL SERVICE
Connection Fee $ 700.00
Facilities Charge $ 450.00
Total Connection Fee $ 1,150.00
NEW COMMERCIAL & INDUSTRIAL SERVICE
Sewer connection must be installed according to specifications of Loudon Utilities.
Facilities Charge will be calculated based on estimated daily flow at a rate of $2.70 per gallon.
NATURAL GAS CONNECTION FEES
Where LUB service mains do not currently extend to the new service address, the Engineering Department will meet with the Customer and/or Developer. An aid-to-construction to extend the service main will be provided.
NEW RESIDENTIAL, COMMERCIAL, AND INDUSTRIAL SERVICES
Tap Fee (First 100 Feet of Service Line) $ 150.00
Additional service line is billed at $ 1.00 per foot